Shared by Colin Ratushniak
Still about 2-3 weeks away from full completion.
Next on the list of things to do:
– final paint touch ups
– 2 squat rack rig system to go up
– mirrors going back up
– turf installed
– rubber mats to be placed
– rubber flooring to be replaced in barbell area (requiring movement of all equipment and flooring will cover all tiles)